![]() |
Operation Terminology Water Skid, LINAC
Today is an accelerator studies day. Pbar will begin stacking around 4 PM. Whenever the stack reaches a level of 120 mA, Operations will put the TeV into shot setup.
|
last modified 9/25/2002 email Fermilab |
![]() |
|
Security, Privacy, Legal | ![]() |