Accelerator Update for August 4, 2006 - August 9, 2006 |
Monday August 7 The day shift began with the Recycler Ring (RR) stash at 2.9 E10, Pbar stack at 88.5 E10. MiniBooNE and NuMI are taking beam. Operations established store 4893 at 8:44 AM with an initial luminosity of 28.65 E30. The low luminosity was due to an A49H separator spark just before scraping. Operations put the Recycler into shot setup at 8:49 AM to stash antiprotons. NuMI turned off at 9:19 AM for access to repair a water leak. Pbar returns to stacking at 9:57 AM. MiniBooNe turned off at 1:30 PM to investigate problems with their dewatering system. Operations put the Recycler into shot setup at 2:47 PM to stash antiprotons. Pbar returns to stacking at 3:06 PM. NuMI turns back on at 3:50 PM. Store #4893 was terminated at 4:03 PM. At 4:24 PM CDF and D0 went in their halls on controlled access. At 4:46 PM the Pbar target stopped rotating, Pbar stacking is off until experts repair the motor. MiniBooNe turned back on at 6:22 PM. They found a bad pump and will turn off tomorrow to replace the pump. Operations put the Recycler into shot setup at 6:59 PM to stash antiprotons. Transfers were completed at 7:24 PM. Pbar stacking is still off due to problems with the rotating target. Shot setup begins at 10:41 PM. Pbar stacking resumed at 11:51 PM. Tuesday August 8 The midnight shift began with Operations in shot setup, Pbar is stacking, NuMI and MiniBooNE are taking beam. Operations established store 4895 at 12:44 AM with an initial luminosity of 89.12 E30. Operations put the Recycler into shot setup at 3:40 AM to stash antiprotons. Pbar returns to stacking at 3:53 AM. MiniBooNe turned off at 6:00 AM to replace a dewatering pump. Operations put the Recycler into shot setup at 11:41 AM to stash antiprotons. Pbar returns to stacking at 12:20 PM. MiniBooNe turned back on at 3:35 PM. A pump was replaced on the dewatering system. Operations put the Recycler into shot setup at 5:31 PM to stash antiprotons. Pbar returns to stacking at 5:51 PM. Store #4895 was terminated at 10:01 PM. Operations put the Recycler into shot setup at 10:27 PM to stash antiprotons. Pbar returns to stacking at 10:39 PM. Wednesday August 9 The midnight shift began with the Recycler Ring (RR) stash at 243.4 E10, Pbar stack at 32.8 E10, and with MiniBooNE and NuMI taking beam. Shot setup begins at 12:37 AM. Operations established store 4897 at 3:55 AM with an initial luminosity of 144.48 E30. Shot setup was delayed due to high temperature indications on I:LAM42. The Plan for Wednesday Keep the store, stack, stash, run beam to NuMI and MiniBooNE. More Information Comments and Suggestions |
last modified 08/09/2006 email Fermilab |
FRLsDFx9eyfrPXgV